台积电将启动建设四座采用1.4纳米技术的工厂。
TSMC to start building four new plants with 1.4nm technology

原始链接: https://www.taipeitimes.com/News/front/archives/2025/07/20/2003840583

台积电(TSMC)计划于今年晚些时候在台湾中部科学园区开始建设四座新的晶圆厂(“Fab 25”),目标是在2028年末实现2纳米晶圆的生产。该园区最近已将土地租赁给台积电,并正在启动以环境保护为重点的扩建工程。 台积电预计这些设施的月产量将达到5万片晶圆。此次扩建是其全球投资计划的一部分,其中包括在亚利桑那州的一项1650亿美元的项目,该项目将容纳其约30%的2纳米及更先进产能。 总体而言,台积电计划在未来几年内建设11座晶圆制造厂和四座先进封装设施,并扩大新竹和高雄科学园区的产能,以满足强劲的客户需求。预计台湾中部科学园区因此将实现超过1.2万亿新台币的年营业额。

相关文章

原文
  • By Huang Hsu-lei, Hung You-fang and Jake Chung / Staff reporter, with staff writer

Taiwan Semiconductor Manufacturing Co (TSMC, 台積電) plans to begin construction of four new plants later this year, with the aim to officially launch production of 2-nanometer semiconductor wafers by late 2028, Central Taiwan Science Park Bureau director-general Hsu Maw-shin (許茂新) said.

Hsu made the announcement at an event on Friday evening celebrating the Central Taiwan Science Park’s 22nd anniversary.

The second phase of the park’s expansion would commence with the initial construction of water detention ponds and other structures aimed at soil and water conservation, Hsu said.

Photo: courtesy of the Central Taiwan Science Park Administration Office

TSMC has officially leased the land, with the Central Taiwan Science Park having handed over the plot last month, he added.

Hsu said he is optimistic that the park’s annual turnover would surpass NT$1.2 trillion (US$40.81 billion), setting a new historic high.

At the North America Technology Symposium in California on April 25, TSMC revealed plans to launch its A14 fabrication processes in 2028.

The four plants in the Central Taiwan Science Park, designated Fab 25, would feature four 1.4-nanometer wafer manufacturing facilities, according to TSMC’s roadmap.

The first plant is expected to complete a risk assesment of wafer production by 2027 and begin mass production by late 2028, with a target monthly output of 50,000 wafers, according to the company’s roadmap.

At the TSMC second-quarter earnings conference and conference call on Thursday, TSMC chairman C.C. Wei (魏哲家) said that after the completion of the company’s US$165 billion investment in the US, “about 30 percent of our 2-nanometer and more advanced capacity will be located in Arizona, creating an independent leading-edge semiconductor manufacturing cluster in the US.”

The Arizona investment includes six advanced wafer manufacturing fabs, two advanced packaging fabs and a major research and development center.

Wei also said that TSMC is planning “to build 11 wafer manufacturing fabs and four advanced packaging facilities over the next several years.”

The company is “preparing for multiple phases of 2-nanometer fabs at the Hsinchu and Kaohsiung science parks to support the strong structural demand from our customers,” Wei said.

联系我们 contact @ memedata.com