2025年4月28日,西班牙遭遇了因伊比利亚电力网骤降而导致的全国性停电。此次事件的官方解释尚未公布,但其起因是多种因素共同作用的结果。风力发电量激增,法国停止电力进口,以及核电站因过载信号关闭,都导致了电网的不稳定。最重要的是,光伏发电量骤降,这很可能是由于设施的自动关闭造成的。 问题的核心似乎在于电网缺乏同步性。稳定基载电力(通常由核电站和大型燃气/水电站提供)的缺失,加上太阳能发电的波动性,导致了水电设施无法调节的频率失衡。 作者认为,电网管理不善、太阳能设施连接不足以及可能的程序错误都扮演了重要角色。西班牙电力公司(Red Eléctrica Española,REE)内部的政治影响以及追求“100%可再生能源”的目标也加剧了这场灾难。作者主张加强欧洲电网互联,进行独立的能源政策技术分析,并根据专业知识而非政治派别来进行任命。

西班牙和葡萄牙的停电事故,在五秒钟内造成15千兆瓦的电力损失,引发了Hacker News上的热议。 原文章缺乏具体信息遭到批评,评论者指出缺少断路器跳闸顺序分析和电力潮流数据。一些人推测其潜在原因包括黑客攻击、时间旅行者或人工智能觉醒,另一些人则指出可能是与太阳能等可再生能源的同步问题。人们对电网在日益依赖可再生能源下的稳定性以及对大型储能解决方案的需求表示担忧。有人计算估计,3-4吉瓦时的电池储能(成本约为30亿欧元)可以防止这次停电,但生产和安装需要较长的准备时间。一些人认为向可再生能源的过渡管理不善,忽视了电网稳定性措施的需求。微型逆变器、频率控制以及太阳能和风能的合成惯性的潜力也成为了讨论的话题。

原文

On the morning of Monday 28 April, nothing was out of the ordinary in peninsular Spain’s electricity system. Demand was at normal levels for the time of year, and was being easily met by the total generation capacity available.

The day before, the Spanish National Grid Network (REE, Red Eléctrica Española, commercially known as Redeia) had held its usual daily auction to determine which facilities would supply energy over the course of the following day. REE manages electricity distribution in Spain, and though formally a private company it is controlled by the Spanish State, which owns 20% of its capital. Its website states that:

“We are responsible for ensuring that electricity is always available wherever you need it and for making it sustainable by promoting renewable energies. For all these reasons, Red Eléctrica is the backbone of the electricity system in Spain and the cornerstone of the ecological transition process that the country is undergoing.”.

Electric energy in peninsular Spain: demand vs forecast on 25 April 2025. REE

12:30: business as usual

At 12:30, most of the country’s energy demand was being covered by renewable sources, especially photovoltaic solar energy, which was contributing just over half of the total. This situation had been repeated throughout the month, as in Spain the combined capacity of solar and wind energy can, given the right conditions, cover the country’s entire electricity demand during the brightest hours in the middle of the day.

The country’s nuclear plants, as planned, were operating at half their usual capacity because, according to their owners, the high charges they are subject to make them economically unviable during periods when the price of electricity is very low.

At that time the price of electricity on the official market was in the negative at around -1€/MWh. At these prices Spain was exporting electricity to Morocco, Portugal, and even France. In addition, much of the available energy was being used to pump water from low lying river basins into reservoirs – the only practical way to store energy on a large scale. However, this capacity has a limit and, with the reservoirs almost full, it cannot continue to be stored indefinitely.

Electric Energy Spain Peninsular generation at 12:30 on 28 April 2025. REE

12:33: something strange happens

In the five minutes between 12:30 and 12:35, something anomalous happened which is still yet to receive an official explanation: a sudden drop in the Iberian electricity grid causes a total blackout.

For the first few minutes confusion reigned, aggravated by the disruption of landline and mobile phone networks. Rumours circulated that other European countries were affected (I myself heard this on the battery-powered radio that I had rushed out to buy), and fingers were quickly pointed at a possible cyber-attack. I doubted this hypothesis, as the computer networks that control electrical systems are usually disconnected from the internet, and a Europe-wide grid outage would lead to something closely resembling an episode of Black Mirror.

After a few minutes my radio, my lifeline, announced that the blackout was limited to the Iberian peninsula, meaning the most likely cause was a technical failure.

What went wrong?

When analysing the available data available from REE between 12:30 and 12:35, we can observe several unusual events.

A few minutes before the outage, fluctuations were observed in the grid, and there was a spike in wind power generation, which had been very low until then. France suddenly stopped importing electricity from Spain, perhaps because it detected a problem in the peninsular grid, and this deepened the imbalance between supply and demand.

At that point, the few operating nuclear power plants received an overload signal. In accordance with protocol, control rods were inserted and they were automatically shut down.

But what was most surprising was the behaviour of solar photovoltaics, which dropped sharply from generating 18,000 MW to just 8,000 MW in just a few seconds. Since the sun had not vanished, it must have been an automated command that switched off thousands of solar facilities.

REE sources indicate that the problem may have been triggered by the disconnection of some solar plants in southwest Spain, but the grid would normally be able to balance this out through regulation – the mechanism for balancing supply and demand. This was being done mainly with hydropower, as normal, but there came a point when this source had exhausted its adjustment capacity.

Current evidence therefore points to a problem in the synchronisation of the grid. All sources feeding power into the grid must be synchronised at the same frequency, 50 Hertz. To facilitate this synchronisation, stable base-load power is required, which is normally provided by nuclear and other large gas and hydroelectric facilities. These sources act as a natural buffer against disturbances, helping to keep the frequency stable in the face of sudden changes in generation or demand.

However, variable renewable sources, such as solar photovoltaic, do not have this capability. They generate direct current which is converted to alternating current at 50 Hertz, but they cannot react automatically to frequency variations.

At 12:33 there was little by way of stable source base in the Spanish grid and, in addition, the few nuclear power plants that were operating had been switched off when they detected a surge in the grid. Hydroelectric facilities were at the limit of their regulation capacity, and no provision had been made for the availability of gas-fired plants.

Fortunately, less than 10 hours later the electrical system had all but recovered. Nevertheless, the damage had been done, and its consequences are still lingering.

Solar photovoltaic (PV) generation on 28 April 2025. REE

The diagnosis

This unusual situation points to a perfect storm of poor grid management and inadequate connections of solar facilities to the grid, as well as other unknown faults. In my opinion, there is a good chance that the computer programmes in charge of managing these systems played an important role, as they may not have been suitably prepared for these kinds of situations.

Although the grid is divided into different zones that can be isolated from one another, all zones were affected when thousands of small solar facilities scattered throughout the grid were disconnected at once. In addition, the interconnection of mainland Spain with the European grid is weak, and a stronger connection to the stable French grid would facilitate the synchronisation of the Spanish grid.

Solar energy during the sunniest hours distorts all offers (at price or negative), making more stable sources economically unviable unless they have a guaranteed price, and discouraging their production. The question is therefore not one of renewables versus nuclear, but rather how much solar power can be in the grid at any given moment while also maintaining stability.

A more worrying root cause is the involvement of politics in REE, as its presidency is typically held by former ministers or high-ranking politicians. Its current president is Beatriz Corredor, a lawyer and a former housing minister, and REE is pursuing the somewhat politicised objective of “100% renewables”.

Within hours of the outage on 28 April, Spanish Prime Minister Pedro Sánchez raised suspicions that the origin of the blackout came from “private operators”, and he accused those arguing that more nuclear input would help stabilise the grid of being ignorant. Spain’s current EU-endorsed energy roadmap includes phasing out all nuclear power stations between 2027 and 2035.

Two days after the blackout, Corredor made public statements for the first time saying that an incident like this would not be repeated, a difficult assertion to make when the causes are still unknown.

It is essential that decisions on energy issues, such as “100% renewables”, have independent technical support that analyses and informs the public with rigour and transparency. A rational analysis should not pit renewables against nuclear, and technical bodies such as REE should be run by people outside of political power structures, preferably with the appropriate technical training. The European Union should also have a coordinated energy policy, and a Europe-wide electricity grid designed to deal with outages or potential external aggression.